
Kitchen Extension Costs in Hertfordshire 2026
Planning a kitchen extension in Stevenage or elsewhere in Hertfordshire? In 2026 most kitchen extensions in London and the South East cost around £55,000 to £90,000, and a typical 25 m² single-storey kitchen extension comes in at about £52,000 to £82,000 fully fitted with a new kitchen. This guide breaks down where that money goes, the extra costs people forget, and how to get an accurate price for your home.

Kitchen extension costs at a glance (2026)
National cost guides updated in autumn 2026 give these figures (MyJobQuote, October 2026, for the build by size and finish):
Small, about 15 m²: £20,000–£38,000
Medium, about 24 m²: £32,000–£60,000
Large, about 48 m²: £63,000–£120,000
Cost per m²: from about £1,300 for a basic finish to over £2,500 for a high-end one
Those are national averages. Homeowners in London and the South East typically pay more: MyJobQuote puts a typical kitchen extension here at £55,000–£90,000, and BestBuilders (September 2026) prices a standard 25 m² South East kitchen extension, fully fitted, at £52,000–£82,000, about 20% above the national baseline.
For the quality builds we price in Hertfordshire, the main build usually sits between £2,200 and £3,500 per m² before VAT and professional fees, the same range as our house extension cost guide.
💡 Pro tip: check whether a price includes the kitchen itself. Many quotes cover the building work only, and the kitchen can add £14,000 to £30,000.
Side return and wrap-around kitchen extensions
Side return extension: about £30,000–£60,000 nationally (MyJobQuote), common on terraced and semi-detached houses with an alley down the side.
Wrap-around extension (rear plus side return): about £40,000–£70,000 nationally for the build (MyJobQuote), or £72,000–£115,000 fully fitted with a kitchen (BestBuilders).
Wrap-arounds cost more because they usually need more steelwork to open up the back and side of the house, and they often need planning permission rather than permitted development.
What the kitchen itself costs
BestBuilders' 2026 breakdown for a mid-range kitchen fit-out:
Units: £6,500–£16,000
Worktops: £1,800–£5,500
Appliances: £2,500–£8,500
Kitchen fitter: £2,200–£4,500
In total that's about £14,000–£30,000. An island, quartz or stone worktops and integrated appliances push it towards the top of the range.
What affects the price of a kitchen extension
Size and shape: a simple rectangle is cheapest per square metre. Corners, wrap-arounds and level changes add cost.
Glazing: bi-fold or sliding doors and roof lanterns are often the biggest single extra, and large openings need steel beams.
Knocking through: removing the old back wall to make one open space needs a structural engineer and steel.
Drainage and services: moving a sink, drains, gas or the boiler adds cost, especially on older houses.
Foundations: clay soil and nearby trees, both common in Hertfordshire, can mean deeper foundations.
Finish: underfloor heating, flooring, lighting and the kitchen specification.
Extra costs to budget for
Drawings: £1,000–£2,500 for planning drawings, and £3,000–£5,000 for building regulations drawings if you hire an architect separately (Checkatrade).
Structural engineer: needed for steel beams. Get a quote.
Planning: a householder application costs £548, a Lawful Development Certificate £274 and prior approval for a larger extension £249 (fees from 1 April 2026).
Building control: get a quote from Hertfordshire Building Control or an approved inspector.
Party wall surveyor: only if you build on or near a shared wall, roughly £700–£3,500+.
VAT: 20% from a VAT-registered builder. Check every quote says whether it's included.
Contingency: keep 10–15% aside for surprises once the ground is open.
Our free Extension Budget Planner has all of these in a printable checklist, with a worksheet for comparing quotes side by side.
Do you need planning permission for a kitchen extension?
Often not. A single-storey rear kitchen extension up to 3 metres deep (4 metres on a detached house) is usually permitted development, and up to 6 or 8 metres is possible with prior approval. Side returns and wrap-arounds, homes in conservation areas and properties with Article 4 directions usually need planning permission. Our guide to permitted development and Lawful Development Certificates explains the limits.
How long does a kitchen extension take?
Most kitchen extensions take about 5 to 10 weeks on site, and larger or more complex builds 3 to 4 months (MyJobQuote). Allow extra time beforehand for drawings, planning and ordering the kitchen, which can take several weeks to arrive.
Is a kitchen extension worth it?
A bigger kitchen-diner is one of the most popular ways to add space and value. Nationwide's research puts the uplift at about 5% for every 10% of extra floor space. We worked through the numbers for Stevenage in our guide to how much value an extension adds.
Get an accurate price for your kitchen extension
Every house is different, so the only way to get a reliable figure is for someone to look at yours. Built Trust is a design and build team based in Stevenage: we handle the drawings, planning and building control, build the extension and fit the kitchen, all under one contract. Book a free home visit for a written, fixed price.
Sources: MyJobQuote, Kitchen extension cost (updated October 2026); BestBuilders, Kitchen extension cost UK (updated September 2026); Checkatrade architect fees; Planning Portal fee schedule for England from 1 April 2026; Nationwide house price research (October 2025). Prices checked November 2026 and are a guide, not a quote.
